Logo
Search
Tools
Tools

Price Cut Map

Where sellers are cutting prices, 50 metros

Resources
Resources

Guides

Proptech, CRE, and marketing guides

FAQs

Quick answers on DSCR, proptech, and marketing

Glossary

NNN, cap rate, NOI, DSCR, and more

Build With Us
Log In
Subscribe free
Briefcase

BRIEFCASE GUIDES / DEAL ANALYSIS

The 70% Rule in House Flipping: Formula, Example, and When to Break It

The 70% rule is a flipping shortcut: pay no more than 70% of a property's after repair value, minus the cost of repairs. On a house worth $300,000 after a $40,000 renovation, the rule caps your offer at $170,000. The 30% gap is meant to cover holding costs, selling costs, financing, and profit.

UPDATED

November 23, 2026


READ TIME

4 min read


TOPIC

Deal analysis


All ​guides ​→

FAQs ​→

EDUCATIONAL NOTE

This page is general information for learning purposes, not lending, tax, legal, or investment advice. Briefcase is a media and marketing company, not a lender, broker, or investment adviser. Terms, ratios, and eligibility vary by lender, sponsor, and deal, so confirm every figure with a licensed professional before you act.

Flippers make offers fast and on thin information. The 70% rule exists so you can screen a deal in the driveway before spending money on inspections. It is a filter, not an underwriting model. Used well, it keeps you from overpaying in a hot market. Used blindly, it can either kill good deals or let bad ones through.


01

The formula

FORMULA

Maximum allowable offer = (ARV x 0.70) minus repair costs

ARV is the after repair value, the price the house should sell for once the work is done, based on recent renovated comparable sales. Repair costs are your full rehab budget, including permits and a contingency. The result is often called the MAO, maximum allowable offer.


02

A worked flip

ARV from renovated comps (hypothetical)

$300,000

70% of ARV

$210,000

Rehab budget with 10% contingency

$40,000

Maximum allowable offer

$170,000

Now check whether the 30% really covers your costs. On this hypothetical deal, assume selling costs of about 7% of the sale price including commissions and seller concessions, so $21,000. Assume buy-side closing costs of $4,000, six months of hard money interest and points of $14,000, and taxes, insurance, and utilities of $6,000. That totals $45,000. Out of the $90,000 gap, about $45,000 is left as profit before tax, or 15% of ARV. If the project runs long or the ARV comes in lower, that margin shrinks fast.


03

Where the rule breaks

01

High-priced markets: on a $900,000 ARV, a 30% gap is $270,000, which is more margin than many experienced flippers need. Insisting on 70% there means losing every deal.

02

Low-priced markets: on a $120,000 ARV, fixed costs such as closing, permits, and insurance eat a bigger share. You may need 65% or less.

03

Heavy rehab: big scopes carry more risk of overruns, so a lower percentage or a larger contingency is prudent.

04

Slow markets: longer days on market raise holding costs. Check local absorption before trusting your timeline.

Many operators adjust the percentage by price band and scope rather than using 70% everywhere. The underlying logic stays the same: start from what the house will sell for and work backward.


04

Getting ARV and repairs right

The rule is only as good as its two inputs. ARV should come from renovated sales of similar size, age, and condition, close by and recent, not from list prices or automated estimates. Our after repair value guide walks through comps. The rehab budget should be built from a walkthrough with a contractor, line by line, with a contingency of 10% to 20% depending on the age of the house and how much you could not see.


05

The 70% rule for rentals and BRRRR

BRRRR investors often use a similar target, but for a different reason. A cash-out refinance on an investment property is usually limited to 75% of appraised value, so buying and renovating for around 70% to 75% of ARV is what lets you pull most of your cash back out. For a straight rental, cash flow tests like DSCR and the 1% rule matter more than the purchase discount.

The ​BRRRR ​method ​→

The ​1% ​rule ​→

Hard ​money ​loans ​→


06

Building your own percentage

Instead of borrowing someone else's 70%, calculate the percentage your business needs. Start with your target profit as a share of ARV, then add your typical selling costs, financing costs, and holding costs as shares of ARV. If you want 12% profit, sell for about 7% in costs, and spend about 8% on financing and holding, your costs and profit total 27%, so you can pay up to 73% of ARV minus repairs. If your projects run longer or you pay higher rates, the number drops. Track actual results after each flip and update the percentage, so your offers reflect your real costs instead of a rule built for someone else's market. A spreadsheet with ten closed deals beats any rule of thumb.


07

70% rule FAQ

Does the 70% include closing and holding costs? No. Those come out of the 30%. Repairs are subtracted separately.

Is the 70% rule a law or lender requirement? No. It is a rule of thumb. Lenders set their own limits, often as a percentage of ARV or of cost.

TAKEAWAYS

The short version

01

Offer no more than 70% of ARV minus repairs.

02

The 30% gap must cover financing, holding, selling, and profit.

03

Adjust the percentage for price band, scope, and market speed.

04

Accurate ARV and a contractor-built budget matter more than the percentage.

05

Treat it as a screen, then underwrite the full deal.

KEEP READING

Related reading

Browse ​all ​guides ​→

FAQs ​→

Glossary ​→

GUIDE

After ​Repair ​Value ​(ARV) ​→

GUIDE

Hard ​Money ​Loans ​→

GUIDE

BRRRR ​Method ​→

GUIDE

The ​1% ​Rule ​→

GUIDE

Absorption ​Rate ​→

BRIEFCASE STUDIO

Real ​Estate ​Data ​Visualization ​→

BRIEFCASE STUDIO

Turn research into a marketing system.

Briefcase Studio builds newsletters, animated data visuals, short-form video, and launch campaigns for proptech and real estate brands. Square Footage is the free weekday briefing of the top US real estate stories.

Talk to Briefcase StudioSubscribe to Square Footage

© 2026 briefcase.
beehiivPowered by beehiiv